News & guidance 13 min read

Fleet management software for workboats: getting ready for Workboat Code Edition 3

First Workboat Code Edition 3 deadline is 13 Dec 2026. How fleet management software keeps certificates, PMS, LOLER and SMS records in order.

On this page

If you run workboats, pilot boats, aquaculture support craft or small offshore vessels in UK waters, 13 December 2026 is a date to circle. The Maritime and Coastguard Agency (MCA) and the Workboat Association have issued a joint “Check. Prepare. Book” message to operators affected by the transitional arrangements for Workboat Code Edition 3, which end on 13 December 2026 (GOV.UK).

That deadline is a good moment to look at how your fleet’s records are kept. Many workboat offices still run on a patchwork of spreadsheets, shared drives, paper logbooks and message groups. It works until a surveyor, an auditor or a client asks for evidence and someone has to pull it together by hand. This guide explains what changes, which records a workboat operator needs to keep on top of, and what to look for in fleet management software for workboats.

This is a plain summary, not legal advice. Read the Code and your certifying authority’s guidance for your own vessels.

What Workboat Code Edition 3 changes, and who it affects

Workboat Code Edition 3 came into force on 13 December 2023. The Code applies to workboats that operate to sea, and to all dedicated pilot boats, of less than 24 metres in load line length, in commercial use (The Workboat Code Edition 3, GOV.UK). The MCA’s launch announcement summarised this as vessels of up to 24 metres in commercial use, including pilot boats, and noted that the Merchant Shipping (Small Workboats and Pilot Boats) Regulations 2023 give the Code effect (MCA announcement). It brings earlier requirements into a single publication, and existing vessels certificated under the Brown Code, its equivalent standard in the technical annex to MGN 280(M), or Workboat Code Edition 2, Amendment 1 have to move across (The Workboat Code Edition 3, GOV.UK).

New workboats and pilot boats have had to use Edition 3 from the date it came into force. Existing vessels must meet Edition 3 by their next renewal examination or three years after the Code came into force, whichever is later. That is why 13 December 2026 matters: the MCA says it is when the first cohort of vessels not to have transitioned must have secured the correct certification to remain active (GOV.UK).

Three details are easy to miss:

  • No mixing and matching. The MCA says that where an existing vessel phases in to Edition 3, it must do so fully. It cannot meet a combination of Edition 3 standards and those of earlier codes (GOV.UK).
  • Safety management has the same date. MCA guidance in MGN 710 (M) says all vessels certificated under Edition 3 must implement a safety management system proportionate to the size, complexity and risk profile of their operations by 13 December 2026, except remotely operated unmanned vessels, which have needed an SMS since 13 December 2023. 13 December 2026 is the date for the first cohort of vessels still to transition. Other existing vessels move across at their next renewal examination or three years after 13 December 2023, whichever is later. The guidance also explains how operators can show that system is working at vessel examinations. If you hold a valid ISM certificate from the MCA or a recognised organisation, MGN 710 (M) accepts it instead. More on both below, and in our Edition 3 SMS checklist.
  • Survey slots are the bottleneck. The joint message exists because the MCA and the Workboat Association want to avoid end-of-year demand for surveys causing a shortage of slots, with vessels tied up while they wait to be seen by certifying authorities.

Why the paperwork, not the boat, is often the problem

When an examination or audit goes badly, the evidence is often the issue rather than the vessel. A typical workboat office still keeps:

  • vessel certificates and survey dates in a folder per boat,
  • crew certificates in a spreadsheet that is updated when someone remembers,
  • planned maintenance in the skipper’s or engineer’s head, or a paper book on board,
  • lifting gear examinations on a separate list kept by whoever arranged the last one,
  • risk assessments, drills and toolbox talks on paper in the wheelhouse.

When a renewal examination comes up, the office has to rebuild the picture by phoning round. With a fixed deadline and limited survey slots, that delay costs days you may not have.

The records a workboat operator needs to keep on top of

Fleet management software for workboats should cover the records that come up at every examination, audit and client vetting. For most UK operators, that means five areas.

1. Vessel certificates and survey dates

Every boat needs its certificate and its examination dates visible at a glance, across the whole fleet, so you can plan surveys and book them before the slots go.

In WaterTightVM, the vessel certificates register keeps certificates per vessel with document storage, inspection schedules and a fleet view of upcoming renewals. There is no built-in Workboat Code certificate type. You record it as a vessel certificate with your own title, such as “Workboat Code”, plus the issue date, expiry date, survey due date and inspection dates, such as annual or intermediate examinations. That gives the office one place to see which vessels face an Edition 3 renewal examination, rather than discovering them late.

2. Crew certificates and competence

On a workboat, a single lapsed certificate can stop the vessel sailing. If the one person holding a required qualification lets it lapse, the boat may not be able to sail. With WaterTightVM’s certificate compliance module, crew add their certificates from the crew app as a photo or PDF, choosing from a fixed list of certificate types that includes the MCA Workboat Endorsement. The certificate holder gets expiry reminders at about 90, 30 and 7 days, on the expiry day and once overdue, and the office sees what is expiring on the web dashboard.

3. Planned maintenance and defects

A workboat earns money when it is working, so maintenance has to be planned around the job, not discovered on it. A planned maintenance system (PMS) gives you an equipment register, scheduled jobs, spare parts and defects in one place, and it is included on every WaterTightVM plan.

WaterTightVM’s maintenance management module does that. Crew can prepare the crew app while connected, complete jobs on board without a signal and sync when the vessel is back in range (offline sync). The office sees the maintenance backlog and open defects across every vessel without calling the skipper.

4. LOLER: cranes, davits and lifting gear

Many workboats carry cranes, A-frames, davits and loose lifting gear. On UK vessels these fall under the Merchant Shipping and Fishing Vessels (Lifting Operations and Lifting Equipment) Regulations 2006. Regulation 12 requires lifting equipment or an accessory for lifting that is exposed to conditions causing deterioration to be thoroughly examined:

  • at least every 6 months for lifting equipment for lifting persons and for accessories for lifting,
  • at least every 12 months for other lifting equipment,
  • or, in either case, in line with an examination scheme drawn up by a competent person,
  • and whenever exceptional circumstances occur, which include modification work, accidents, natural phenomena and prolonged periods of inactivity (legislation.gov.uk, regulation 12).

The MCA’s guidance on the regulations is MGN 332 (M+F) Amendment 4. The “prolonged periods of inactivity” trigger matters for workboats that are laid up over winter or tied up waiting for a survey.

WaterTightVM’s LOLER lifting equipment module is an optional module that works alongside the PMS, included from the Advanced plan up. It keeps a register of lifting appliances with inspection types and certificates, reminds you before each examination falls due and lets you sign off several items in one pass. Because it sits with maintenance, there is no separate LOLER spreadsheet to keep in step.

5. Safety management, drills and risk assessments

Clients, insurers and auditors want to see a working safety system, not a binder. WaterTightVM’s safety management tools cover incident reporting, drills and exercises, risk assessments, safety meetings and an SMS document library where crew can read and acknowledge documents marked for read tracking, in the crew app or on the web.

The Safety module also holds Workboat Code records: pre-departure briefings for vessels under 24 metres load line length, and a record of MAIB filings. These are your own records, kept separately from the certificate register. WaterTightVM does not file anything with the MAIB or the MCA for you. WaterTightVM can also track five core Workboat Code documents (Master’s overriding authority, drug and alcohol policy, operating procedures, emergency procedures, and health and safety policy) and set your next SMS review three years on. Ask us on a call how this is set up for your fleet.

When the MCA issues a new notice, such as its updated guidance on hydrodynamic interaction in narrow channels and shallow water (MGN 199 (M) Amendment 1), you can send it to crew as a document to read and see who has acknowledged it.

Safety management system evidence for Workboat Code Edition 3

The safety management system (SMS) is the part of Edition 3 that is about paperwork rather than steel, so it is the part most likely to be left late. This is what the MCA’s guidance says, in short. The full list is in our Edition 3 SMS checklist.

What the SMS must cover. Appendix 8 of the Code says a proportionate SMS includes a safety and environmental protection policy, risk assessment for safe working, a health and safety protection policy, the responsibilities of the Master and personnel, training of personnel, procedures for safe operation, emergency procedures and exercises, reporting of accidents, maintenance of the vessel and equipment, and a review at least once every three years. It also asks for a designated person ashore. Section 31 separately requires cyber security measures.

How to show it works. MGN 710 (M) says the primary method is a self-assessment, completed at least once a year for each vessel, with a template in its Annexe A. Another method is allowed if it gives comparable structure, clarity and evidence. Whichever you choose, the documentation must be available to the certifying authority to sample at each examination. The certifying authority samples what you show it. It does not audit the SMS or help write it.

If you hold an ISM certificate. A valid ISM certificate issued by the MCA or an MCA-recognised organisation is accepted in place of the Edition 3 SMS requirements, whether the ISM certification is mandatory or voluntary. For a vessel that carries out remotely operated unmanned operations, MGN 710 (M) says the ISM SMS must also adequately cover those operations.

Where WaterTightVM fits. You write and own the SMS, and use the MCA’s MGN 710 self-assessment, or an equivalent method, to show it is working. WaterTightVM holds the documents and working records alongside that system. Office users upload SMS documents to the SMS documents library, which is organised in sections. Each document can carry a version and a note of what changed. WaterTightVM can also track five core Workboat Code documents (Master’s overriding authority, drug and alcohol policy, operating procedures, emergency procedures, and health and safety policy) and set your next SMS review three years on, with reminders before it falls due. The tick shows a document is on file, not what it says. Ask us on a call how this is set up for your fleet. When an SMS library document is marked for read tracking, crew can read and acknowledge it in the crew app or on the web. The office can see by name who has not acknowledged the current version. Acknowledging in the app needs a connection. Uploaded SMS documents are not tracked unless that option is turned on. Drills and exercises, checklists and planned maintenance sit alongside. These records support your SMS. They do not make a vessel compliant, and the examination and certification stay with your certifying authority.

Starting-point templates. Safety → SMS also offers 13 editable Word (.docx) templates for the sections of a Workboat Code Edition 3 SMS, based on the Workboat Code Appendix 8 headings, with an extra cyber security section from section 31.3. Download them one at a time or all together as a ZIP, edit them for your vessels and operation, then upload your finished versions to the SMS library. They are starting points, not an approved SMS: they are not MCA-approved, using them does not by itself satisfy the Workboat Code, and the owner or operator stays responsible for compliance. Use the MCA’s MGN 710 (M) self-assessment, or an equivalent method, to show your SMS is working; WaterTightVM holds the documents and working records alongside it.

What to look for in fleet management software for workboats

Software built only for large deep-sea fleets can be a poor fit for a workboat operation. When you compare vessel management software, check these points.

  1. It works at your size. From a single vessel to a whole fleet, you should be able to start with the records that hurt most, such as certificates and maintenance, without a long rollout.
  2. It works offline. Workboats spend their day in lochs, wind farms and harbours with patchy signal. Crew need to record work without a connection.
  3. Ship and shore share one record. The skipper and the office should see the same certificates, jobs and defects, not two versions that drift apart.
  4. It covers UK needs. A LOLER register, MCA guidance notices and UK crew certificates should be part of the system, not a separate spreadsheet.
  5. Evidence comes out easily. Before a survey or client audit, you should be able to pull certificates, maintenance history and safety records from live data.
  6. Crew will actually use it. A simple crew app beats a desktop portal nobody logs into at sea. WaterTightVM’s iOS crew app is currently in TestFlight beta, and tablets can use the installable web app (mobile app).

WaterTightVM was built by a Master Mariner for fleets of any size, from a single vessel to a whole fleet, including workboat, offshore and aquaculture support companies, as well as other vessel types. See the platform for the full module list, or read how operators move away from spreadsheet vessel management. For another UK regulatory change, see our note on the MCA consultation on the Domestic Safety Management Code.

A pre-deadline checklist for workboat operators

Use this list in the weeks before 13 December 2026:

  1. List every vessel and the code it is currently certificated under (Brown Code, the MGN 280(M) annex, Edition 2 or Edition 3).
  2. Note each vessel’s next renewal examination date, and work out which ones must meet Edition 3 by 13 December 2026.
  3. Contact your certifying authority and book survey slots now, as the MCA and the Workboat Association advise.
  4. Check your safety management system against MGN 710 (M) and how you will show it is working at the examination, using our Edition 3 SMS checklist. If you hold a valid ISM certificate from the MCA or a recognised organisation, check with your certifying authority how it applies.
  5. Check crew certificates for anything expiring in the next six months.
  6. Bring planned maintenance up to date and close out open defects before the surveyor arrives.
  7. Check every crane, davit and lifting accessory against its last thorough examination, including gear that has been idle.

If any of those steps means opening five folders and a spreadsheet, that is the case for putting it in one system.

Get your workboat fleet ready

The Edition 3 deadline is a fixed date, and survey slots will not get easier to find in December. Getting certificates, maintenance and lifting gear records into one place now makes the next examination, audit or client vetting simpler to prepare for.

Book a 30-minute call to see WaterTightVM with your own fleet in mind, or see the platform first.

Any questions, just get in touch. If you’re not sure we cover something you need, outline the issue and we’ll find a way to solve it.

Sources

Frequently asked questions

What is fleet management software for workboats?
It is software that keeps a workboat operator's compliance and operational records in one place: vessel and crew certificates, planned maintenance, defects, lifting equipment and safety records. The office and the crew on board work from the same record.
When does the Workboat Code Edition 3 transition end?
Existing vessels must meet Edition 3 by their next renewal examination or three years after the Code came into force on 13 December 2023, whichever is later. The MCA says that means 13 December 2026 is when the first cohort of vessels that have not transitioned must hold the correct certification to remain active.
Which vessels does Workboat Code Edition 3 cover?
The Code applies to workboats that operate to sea, and to all dedicated pilot boats operating at sea or in categorised waters, carrying cargo and/or not more than an aggregate of 12 passengers and industrial personnel. A small vessel in the Code is one of less than 24 metres in load line length (or, if the keel was laid before 21 July 1968, less than 150 tons). It also covers remotely operated unmanned vessels and craft using alternative fuels and propulsion. The MCA's 13 December 2023 announcement summarised this as vessels of up to 24 metres in commercial use, including pilot boats.
How often does lifting equipment on a workboat need a thorough examination?
Under regulation 12 of the Merchant Shipping and Fishing Vessels (Lifting Operations and Lifting Equipment) Regulations 2006, equipment exposed to conditions causing deterioration must be thoroughly examined at least every 6 months for equipment that lifts people and for accessories for lifting, and at least every 12 months for other lifting equipment, or in line with an examination scheme. A thorough examination is also needed after exceptional circumstances, which include modification work, accidents, natural phenomena and prolonged periods of inactivity.
Can I record my Workboat Code certificate in WaterTightVM?
Yes, as a vessel certificate with a title you enter yourself, plus its issue date, expiry date, survey due date and inspection dates. WaterTightVM does not have a built-in Workboat Code certificate type or a Workboat-specific survey schedule, and it does not file anything with the MCA or MAIB.
Can WaterTightVM keep a LOLER register?
Yes. LOLER is an optional module that works alongside planned maintenance, included from the Advanced plan up. It keeps a register of lifting appliances with inspection types, certificates, batch sign-off and reminders before examinations fall due. Planned maintenance itself is on every plan.
Does WaterTightVM work without a signal?
The crew app works where the vessel works. Crew prepare it while connected, then complete maintenance jobs and other records on board without a signal, and changes sync when the vessel is back in range. The iOS crew app is currently in TestFlight beta, and tablets can use the installable web app.
What safety management evidence does Workboat Code Edition 3 need?
MGN 710 (M) says every vessel certificated under Edition 3 must implement a safety management system proportionate to its size, complexity and risk by 13 December 2026, except remotely operated unmanned vessels, which have needed an SMS since the Code came into force. Appendix 8 of the Code lists what it must cover, from policies and risk assessment to emergency exercises, maintenance records and a review at least every three years. The primary way to show it is working is a self-assessment, and the documentation must be available to the certifying authority to sample at each examination.
Do I need an SMS for Workboat Code Edition 3 if I hold an ISM certificate?
MGN 710 (M) says a valid ISM certificate issued by the MCA or an MCA-recognised organisation is accepted in place of the safety management system requirements in Edition 3. That applies to mandatory and voluntary ISM certification. For a vessel that carries out remotely operated unmanned operations, MGN 710 (M) says the ISM SMS must also adequately cover those operations. Check with your certifying authority how it applies to your vessels.
Does software replace my certifying authority's survey?
No. Software keeps your records and evidence in order. The examination and certification are still carried out by your certifying authority.

Related platform pages

Inside WaterTightVM · Vessel Certificates

See how WaterTightVM keeps these records

  • Certificate sections per vessel
  • Document storage
  • Inspection types and schedules
Book a 30-minute call See the platform
Solution — Vessel Certificates: desktop screenshot
Homepage — Crew mobile app screenshot
Book a 30-minute call