Build The Spec, Compare Yard Quotes, Control The Extras
The base spec locks when a quote is awarded or docking starts, keeping approved scope separate from new work, and a punch list warns you if critical class or undocking items are still open when docking is finished.
Why fleets still struggle
The cost of how it’s done today
Dry-dock specs assembled in Word and priced in email lose the link to PMS work, and extras discovered in the yard blow the budget with no approval trail.
The traditional approach
A spec document rebuilt each docking, yard quotes compared by hand, and extras reconciled from invoices weeks after the ship has sailed.
With WaterTightVM
What changes when this is under control
A dry-dock workspace for the whole docking: build the spec from PMS jobs, defects and vessel equipment, compare yard quotes, track extras and variation orders, plan the yard stay on a timeline, log progress daily and clear the undocking checklist.
Time back
Spec lines come from PMS jobs, defects and vessel equipment instead of being retyped, and a previous docking's spec can be copied across as the starting point.
Less waste
Extras are logged with cost and approval references, and each variation order is quoted, approved or rejected with its cost and schedule impact, so yard invoices reconcile against an authorised trail, not guesswork.
Lower risk
The base spec locks when a quote is awarded or docking starts, keeping approved scope separate from new work, and a punch list warns you if critical class or undocking items are still open when docking is finished.
In the module
How Dry Dock delivers it
Spec lines from PMS jobs, defects and vessel equipment
Copy a spec from a previous docking
Yard quote comparison
Extras and variation order approvals
Timeline (Gantt) with an out-of-water window
Punch list and undocking checklist
Daily progress chart, report and owner update
Capabilities
- Per-vessel projects with yard windows and a fleet dry-dock calendar
- Spec lock on quote award, or when you start docking
- Ownership per job: yard, subcontractor or crew
- Criticality and out-of-water flag on every job
- Photos attached to line items, shown in the spec PDF
- Spec, extras and dry-dock report PDFs, with a per-job option to leave work out of the yard PDF
- Yard Excel export for tendering
- Actual cost capture during the yard stay
- Links to PMS equipment UIDs
- Summary totals for management review, including approved and pending variation orders
Ship to shore
How the work moves
- Superintendent creates a dry-dock project and yard window
- Spec lines come from PMS jobs, defects, equipment or a previous docking, and general terms are added
- Yard quotes are compared and one is awarded, locking the spec
- Docking starts: progress is logged daily, variation orders are approved or rejected and the owner update goes out
- Punch list is cleared, docking is finished and the report is exported
Questions before you commit
Which plans include dry dock?
Can the spec pull from PMS?
How are extras kept separate from the base spec?
Can I compare multiple yards?
How do variation orders work?
Can I plan and track the yard stay?
Can I update the owner or management each day?
Is there an undocking checklist?
Do exported PDFs prove work was done?
Related solutions
See it in 30 minutes
Book a 30-minute call and we'll show Dry Dock on a sample vessel, set up the way your technical superintendent and project manager work.
Any questions, just get in touch. If you’re not sure we cover something you need, outline the issue and we’ll find a way to solve it.